OLAY / MANUFACTURING

How Our Sofas Are Made

A sofa manufacturing brief connects the approved design with its construction, upholstery and assembly requirements. The sequence and details depend on the selected product.

Image placeholder — approved OLAY photograph pending
Image pending · Furniture construction or upholstery detail
01

PROCESS REFERENCE

Specification Review

Establish the drawing, material schedule and sample reference used for the order. Resolve missing dimensions and open construction questions before production release.

Keep revision references consistent across the documents used for manufacture and inspection.

02

PROCESS REFERENCE

Frame and Support Construction

Confirm the frame and support requirements for the actual design. Materials, joints and support components must follow the agreed specification.

Confirm the frame material, support components and approved construction for the selected model.

03

PROCESS REFERENCE

Padding, Cutting and Sewing

Define the padding and upholstery references, including relevant seam and pattern directions. Cutting and sewing details should align with the selected material and approved appearance.

Comfort decisions need a product-specific reference rather than a general firmness label.

04

PROCESS REFERENCE

Upholstery and Assembly

Review how the upholstery, components and visible finishes come together on the chosen design. Confirm orientation and connection details where applicable.

The approved sample and drawings provide the reference for the intended result.

05 / MANUFACTURING

Inspection and Packing Handover

Inspection and packing preparation should use the same item and specification references. Identify findings that need resolution before handover.

Confirm the relevant item references, approved details and agreed packing instructions at the handover between inspection and shipment preparation.

FORM / COMFORT / CRAFT

Start with the reference, dimensions and quantities. Let the specification shape the next conversation.