OLAY / SOLUTIONS
Contract Seating for Commercial Lounge Projects
Develop a seating schedule for reception, waiting and informal gathering spaces. Connect the intended use to the product configuration, materials and project requirements.
01 / SOLUTIONS
Define the Commercial Seating Brief
Describe the space and how its seating will be used. Identify expected maintenance needs and any project-specific standards that must be considered.
Review the selected product and material specification against the actual requirements of the space.
A CONSIDERED BRIEF
Record the product reference, dimensions, material direction and quantities. Confirm the selected specification before production.
02 / SOLUTIONS
Develop the Seating Schedule
List sofas, individual chairs and modular components by item code. Include dimensions, configurations and quantities.
Show the arrangement on a plan so the furniture can be reviewed within the complete space.
03 / SOLUTIONS
Resolve Specification Requirements
State material references, performance evidence and documentation required by the project. Confirm suitability for the actual selected product.
Any testing requirement, responsibility and timing should be agreed before the order progresses.
04 / SOLUTIONS
Coordinate Samples and Production References
Define the sample decisions and the documents needed for approval. Record drawings, materials and changes against the relevant item code.
The agreed reference should be clear enough to guide both production and inspection.
05 / SOLUTIONS
Discuss the Project Scope
Send the seating schedule, plan and product references. Include the destination, target timing and any inspection or packing requirements.
We can use the brief to identify the product information and development decisions still needed.
FORM / COMFORT / CRAFT
Start with the reference, dimensions and quantities. Let the specification shape the next conversation.
